Skip to content

Waterway Notices / Wrenbury Bridge, Bridge 20

Navigation Closure beginning 28 September 2026 at 15:08 at Bridge 20, Wrenbury Bridge.

This is a live notice. Please check the Canal & River Trust website for the latest information. View on Canal & River Trust website.

Summary

TypeNavigation Closure
Start Date28 September 2026 at 15:08
End DateOngoing
Start LocationBridge 20, Wrenbury Bridge
Ends LocationBridge 20, Wrenbury Bridge

Updates

15 October 2026 at 12:54

Since our last update, our engineering team and contractors have agreed a method of repair to the damaged bridge substructure following the recent vehicle strike.

The next stage of the works we will be instructing specialist contractors to undertake the removal of the bridge substructure. As part of these works, concrete barriers will also be installed to help protect any further damage to the bridge.

Once the specialist contractors has been appointed, a date for the works will be scheduled and we will be able to provide further information on the timeframe for the repairs.

A further update will be provided on or before Thursday 22 October.

8 October 2026 at 14:54

Since our last update, our engineering team and contractors have continued working on plans to safely take down the damaged bridge following the recent vehicle strike.

Our contractors are currently reviewing the proposed method of repair for carrying out these works, and the closure will remain in place while this is being finalised.

Once a date for the works have been confirmed, we will be able to provide more information on the next steps.

A further update will be provided on or before Thursday, 15 October.

1 October 2026 at 15:34

Since our last update, our engineering team have been working with contractors to develop a plan to safely take down the damaged bridge following the recent vehicle strike.

Once the bridge has been made safe, we will be able to assess the next steps required to repair the damaged timber support.

A further update will be provided on or before Thursday, 8 October.

28 September 2026 at 15:06

Navigation is currently closed at Bridge 20, Wrenbury Bridge on the Llangollen Canal due to a vehicle strike, which has caused damage to the timber support.

Our local team have attended site to carry out an inspection and assess the extent of the damage so a method of repair can be planned.

An update will be provided on or before Friday, 2 October.

Map

UK Waterways Ranking System