Waterway Notices / Ebstree Lock, Staffs and Worcester Canal
Navigation Closure beginning 8 September 2026 at 20:10. Starting at Lock 27 Ebstree Lock, ending at Ebstree Pipe Bridge.
This is a live notice. Please check the Canal & River Trust website for the latest information. View on Canal & River Trust website.
Summary
| Type | Navigation Closure |
| Start Date | 8 September 2026 at 20:10 |
| End Date | Ongoing |
| Start Location | Lock 27 Ebstree Lock |
| Ends Location | Ebstree Pipe Bridge |
Updates
9 September 2026 at 10:06
Contractors have attended site to assess the fallen tree. Following their inspection, it has been determined that specialist equipment is required to safely remove the obstruction.
The necessary equipment is currently being arranged, and the team is scheduled to return to site tomorrow morning (Thursday 10 September) to undertake the removal works. A further update will be provided as soon as more information is available.
8 September 2026 at 20:08
A tree has fallen down, blocking the navigation just south of Ebstree Lock. The tree fell from the off-side towards the towpath and is blocking the canal only - the towpath remains open. A contractor will be required to deal with the tree and reopen navigation, this is hoped to be dealt with on 09/09/2026.