Skip to content

Waterway Notices / Lock 24, Bratch Middle lock

Navigation Closure beginning 2 November 2026 at 08:00 to 18 December 2026 at 16:00. Starting at Lock 23 Bratch Bottom Lock, ending at Lock 25 Bratch Top Lock.

This is a live notice. Please check the Canal & River Trust website for the latest information. View on Canal & River Trust website.

Summary

TypeNavigation Closure
Start Date2 November 2026 at 08:00
End Date18 December 2026 at 16:00
Start LocationLock 23 Bratch Bottom Lock
Ends LocationLock 25 Bratch Top Lock

Updates

1 May 2026 at 11:06

A navigation closure is required to carry out replacement of the top gate. The full flight will be closed so water levels can be controlled and the works carried out safely.

Map

UK Waterways Ranking System