Notice Archive /
Bank Dole Cut
This notice is archived and no longer active.
Detail
Type | Advice |
Start Date | 4/27/2024, 1:45:00 PM |
End Date | 2/20/2025, 3:30:00 PM |
Start Location | Bank Dole Lock (Lock 5) |
Ends Location | Bank Dole Lock (Lock 5) |
Towpath Closed | No |
Description
The sluice water deflector on the upstream gate sluice (none-house/river side) is missing. When travelling upstream from the River Aire, please open the opposite side sluice first. Only operate the none-house/river side sluice once the water in the lock is half way up.
Thank you.