Notice Archive /

Construction of telecoms ducts in the towpath and associated works

This notice is archived and no longer active.

Detail

From Date:12/02/2024 07:00
To Date:19/02/2024 18:00 inclusive
Type:Advice
Reason:3rd Party Works
Is the towpath closed?No

Description

Construction of a new telecoms connection into the existing euNetworks chamber on the towpath between Uxbridge Road and Wexham Road bridges. Further duct protection measures beneath Uxbridge Road bridge are to be installed along with new telecoms ducts over the existing canal bridge. Pedestrian access will be maintained with a pontoon deck.

Closest waterway:Slough Arm (Grand Union Canal)
Starts at:Bridge 11, (A412)
Ends at:Bridge 11, (A412)