Notice Archive /
Construction of telecoms ducts in the towpath and associated works
This notice is archived and no longer active.
Detail
Type | Advice |
Start Date | 2/12/2024, 7:00:00 AM |
End Date | 2/19/2024, 6:00:00 PM |
Start Location | Bridge 11, (A412) |
Ends Location | Bridge 11, (A412) |
Towpath Closed | No |
Description
Construction of a new telecoms connection into the existing euNetworks chamber on the towpath between Uxbridge Road and Wexham Road bridges. Further duct protection measures beneath Uxbridge Road bridge are to be installed along with new telecoms ducts over the existing canal bridge. Pedestrian access will be maintained with a pontoon deck.