Advice: Station Road Bridge, Cradley Heath, Dudley No 2 Canal
This notice is archived and no longer active.
Detail
Type | Advice |
Start Date | 11/8/2023, 7:00:00 AM |
End Date | 3/1/2024, 5:00:00 PM |
Start Location | Wrights Bridge, Station Rd |
Ends Location | Smiths Bridge, Cradley |
Towpath Closed | No |
Description
Third party contractors will be removing the existing bridge deck and replacing it with earthworks followed by carriageway and parapet construction.
As part of these works a polyethene sheet, a silt curtain and a boom will be installed on the canal side of the existing sheet pile wall. Divers will be used to install the polyethene sheet from 08/11/23 to 30/11/23 and the boom and silt curtain will remain in place until the planned completion date of the works, which is expected to be 01/03/24.
Banksman and signage will be utilised. The towpath will remain open and users will be asked to follow signed diversion when demolition of the southern deck starts by using a temporary scaffold walkway diversion.