Loading notice...
Navigation Restriction beginning 2 December 2025 at 08:00 to 19 December 2025 at 17:00 at Ocker Hill Power Station Basin Bridge.
This notice is archived and no longer active.
| Type | Navigation Restriction |
| Start Date | 2 December 2025 at 08:00 |
| End Date | 19 December 2025 at 17:00 |
| Start Location | Ocker Hill Power Station Basin Bridge |
| Ends Location | Ocker Hill Power Station Basin Bridge |
Third-party contractors will be installing scaffolding within the navigation to refurbish and repaint a gas pipe running alongside the canal. This will result in a temporary reduction in navigation width at the work site.
Signage and buoys will be placed both upstream and downstream to alert boaters and towpath users. Please proceed with caution and follow all signage and any instructions provided by the contractors.