A38(m) Bridge Tame Valley Canal, Birmingham
This is a live notice. Please check the Canal & River Trust website for the latest information. View on Canal & River Trust website.
Detail
Type | Advice |
Start Date | 9/23/2025, 7:00:00 AM |
End Date | 9/24/2025, 4:00:00 PM |
Start Location | M6 Main Carriageway Bridge |
Ends Location | Salford Bridge (Lichfield Road) |
Updates
16 September 2025 at 15:07
Third party contractors are to be carrying out inspection works to the A38(m) Bridge from the Tame Valley canal using a floating pontoon.
The pontoon is to be positioned to allow waterway traffic to pass during the works.
Signage is to be placed both upstream and downstream of the works to notify boaters.