Detail
| Type | Navigation and Towpath Closure |
| Start Date | 1/5/2026, 8:00:00 AM |
| End Date | 3/13/2026, 4:00:00 PM |
| Start Location | York Street Lock |
| Ends Location | York Street Lock |
Updates
19 December 2025 at 15:13
We'd like to clarify the dimensions of this stoppage. The navigation will be closed at York Street Lock, with an upstream winding hole at Whittington and a downstream winding hole at Stourport Basin.
5 December 2025 at 15:45
Following a review of these works, we now require additional time on site to complete them to the required standard. As a result, the stoppage will now run from 5th January to 13th March.
8 May 2025 at 22:59
A navigation and towpath closure are required for top and bottom lock gate replacements.