Notice Archive / Batchworth Mooring - above Batchworth Lock 81
Navigation Closure Notice from 9 January 2026 at 08:00 to 20 February 2026 at 16:00. Starting at Lock 81, Batchworth Lock, ending at Lock 81, Batchworth Lock.
This is a live notice. Please check the Canal & River Trust website for the latest information. View on Canal & River Trust website.
Summary
| Type | Navigation Closure |
| Start Date | 9 January 2026 at 08:00 |
| End Date | 20 February 2026 at 16:00 |
| Start Location | Lock 81, Batchworth Lock |
| Ends Location | Lock 81, Batchworth Lock |
Updates
26 January 2026 at 13:35
Following the dewatering of the navigation, further essential work has been identified to ensure this repair can be completed safely and to the correct standard. As a result, the current stoppage will need to be extended. During the inspection, a section of approximately 12 metres of the existing wall was found to be in significantly worse condition than originally anticipated. This section must be fully dismantled so that new foundations can be installed, before the wall can be rebuilt. The navigation is now scheduled to reopen on 20 February 2026. These works will be completed by this date, and passage will be made available over the following weekend, ahead of the next planned stoppage at Lotmead Lock 80, which begins on 23 February 2026. We apologise for any inconvenience this extension may cause and thank you for your patience while we complete this essential repair.
7 January 2026 at 13:47
Following recent site conditions, there has been a slight delay in mobilisation due to ice. The contractor is now scheduled to mobilise on 09 January, with dam installation planned for 12 January.
Navigation will be closed from Batchworth Lock (Lock 81) to 100m above the lock, where a fabric dam and demarcation will be in place.
Please note that the towpath will remain open throughout the works, although there may be short, temporary restrictions while equipment is repositioned. Thank you for your understanding and cooperation.
7 May 2025 at 20:29
A navigation and towpath closure are required for coping repair works.