Towpath and Mooring suspension between Old Oak Lane and Scrubs Lane Bridge
This is a live notice. Please check the Canal & River Trust website for the latest information. View on Canal & River Trust website.
Detail
Type | Towpath Closure |
Start Date | 5/19/2025, 8:00:59 AM |
End Date | 5/31/2025, 5:00:59 PM |
Start Location | Bridge 7Ba (Footbridge) |
Ends Location | Bridge 7Ba (Footbridge) |
Description
Updates
Contractor will be carrying out construction works on the towpath. The towpath and moorings will be suspended for the duration of the works. Floating pontoons will be sited alongside the towpath so that a through route will be available for the duration of the works. The towpath closure and mooring suspension will be between What3Words locations of ///study.entire.edits and ///volunteered.slug.inner This notice was originally posted on an old system which has now been upgraded, the original description and latest update have been transferred here. To view any historical updates related to this notice, please click here ([link to file](https://canalrivertrust.org.uk/media/report/existing-notifications-before-new-system-migration.xlsx)).
5/2/2025